Abstract: In This Research the technical and economic performance continuous feed system restore cell number to240 Al of 1Al-Mahdi has been integrated.at first briefly The current method feed cell and their defects is investigated. Then Air System transport is introduced and how the technical implementation is suggested . The proposed technical and The process diagram and Some general features of the target system is provided. These features is make threedimensional modeling system Using 3D modeling software. A preliminary list of required equipment and materials Another part of The technical proposal. then, the proposed timing and estimated costs of this project are presented. The suggested time for this Project is 305 Day. And the cost of doing it if you use a air slides with square section 30 billion rials is estimated. According to economic studies Was time to return on investment for this project for two years ,After the system is started is estimated